Use this free concrete calculator to estimate the volume of concrete for a slab, footing, wall, column, or round post hole. It converts the volume to cubic meters, cubic feet, and cubic yards, estimates the number of pre-mix bags, and finds the cement, sand, and aggregate for a mix ratio such as 1:2:4. You can add extra for waste. Steps are included. No signup needed.
Estimate concrete volume, ready-mix quantity, pre-mix bags, cement, sand, and gravel for your construction project.
Site-mix material estimates use a dry volume factor of 1.54 and an approximate cement density of 1,440 kg/m³.
| Shape | Formula |
|---|---|
| Slab | Length × Width × Thickness |
| Strip Footing | Length × Width × Depth |
| Wall | Length × Height × Thickness |
| Rectangular Column | Width × Depth × Height |
| Round Column / Post Hole | π × Radius² × Height |
| Waste Allowance | Base Volume × (1 + Waste %) |
| Conversion | Equivalent |
|---|---|
| 1 cubic meter | 35.3147 cubic feet |
| 1 cubic meter | 1.308 cubic yards |
| 1 cubic yard | 27 cubic feet |
| 1 foot | 12 inches |
| 1 meter | 100 centimeters |
| 1 meter | 1,000 millimeters |
Concrete weight is estimated at approximately 2,400 kg per cubic meter (150 lb per cubic foot). Actual density varies with the mix and materials.
Keep all the dimensions in consistent units, or use the unit selector for each measurement.
Slab or wall (a rectangular box): Volume = Length × Width × Thickness
Strip footing: Volume = Length × Width × Depth
Rectangular column: Volume = Width × Depth × Height (× number of columns)
Round column or post hole (cylinder): Volume = π × (Diameter ÷ 2)² × Height
With waste: Volume to order = Volume × (1 + Waste %)
Unit conversions:
Weight of concrete: about 2,400 kg per cubic meter (150 lb per cubic foot)
All answers are rounded for display.
A slab that is 4 m long, 3 m wide, and 0.1 m (100 mm) thick.
A slab that is 10 ft by 10 ft and 4 in thick.
A garage slab that is 24 ft by 24 ft and 6 in thick.
A footing that is 20 m long, 0.45 m wide, and 0.3 m deep.
Each column has a diameter of 0.3 m and a height of 3 m.
A post hole with a diameter of 12 in (1 ft) and a depth of 4 ft.
A wall that is 5 m long, 2.4 m high, and 0.2 m thick.
Dry materials take up more space than the finished concrete, because there are gaps between the particles. A common factor is 1.54.
A slab that is 5 m by 4 m and 0.15 m thick, with a 1:1.5:3 mix.
3 m³ × 2,400 kg per m³ = 7,200 kg (7.2 tonnes).
Plan for the weight when you move, carry, or support the concrete.
One cubic yard is 27 ft³.
| Bag size | Yield per bag | Bags per yd³ |
|---|---|---|
| 80 lb | 0.60 ft³ | 45 |
| 60 lb | 0.45 ft³ | 60 |
| 50 lb | 0.375 ft³ | 72 |
Yields differ by brand, so check the label.
A pour of 3 m³ with 5% extra: 3 × 1.05 = 3.15 m³ to order. Ready-mix suppliers have their own ordering units and minimums, so ask the supplier.
| Mix (cement : sand : aggregate) | Common name | Cement per m³ (50 kg bags) |
|---|---|---|
| 1 : 1 : 2 | M25 | about 11.1 |
| 1 : 1.5 : 3 | M20 | about 8.1 |
| 1 : 2 : 4 | M15 | about 6.3 |
These figures use a dry volume factor of 1.54 and a bag volume of 0.0347 m³. The grade names (M15, M20, M25) come from standards used in some regions. Mix ratios, grades, and water-cement ratios differ by country, standard, and use.
Structural concrete (footings, columns, beams, slabs that carry loads) should follow the mix design and specification from a qualified engineer. Ratio-based mixes are for estimates and simple work only.
| Bag size | Yield |
|---|---|
| 80 lb (36 kg) | about 0.6 ft³ |
| 60 lb (27 kg) | about 0.45 ft³ |
| 50 lb (23 kg) | about 0.375 ft³ |
Check the yield printed on the bag you buy.
| Pre-mix bags | Ready-mix | |
|---|---|---|
| Best for | Small jobs, such as posts and small slabs | Larger pours |
| Effort | You mix and carry every bag | Delivered, but you need to be ready to place it |
| Cost | Higher per volume | Usually lower per volume on bigger jobs |
| Timing | You control it | You must be ready when the truck arrives |
As a rough guide, many people switch to ready-mix when a job needs more than 1 to 2 cubic yards (about 1 to 1.5 m³), but prices and minimum orders differ. Ask for local quotes.
Multiply the length, width, and thickness of the area (in the same unit) to get the volume. For a 4 m by 3 m slab that is 0.1 m thick, the volume is 1.2 m³. Add 5% to 10% for waste.
About 1.23 cubic yards (33.33 cubic feet). With 10% extra, about 1.36 cubic yards.
About 45 bags, based on a yield of 0.6 cubic feet per bag (27 ÷ 0.6).
For a 1:2:4 mix, about 6.3 bags of 50 kg cement. For a 1:1.5:3 mix, about 8 bags. These use a dry volume factor of 1.54.
About 1.54. Dry cement, sand, and aggregate take up more space than the finished concrete.
1 part cement, 2 parts sand, and 4 parts coarse aggregate, by volume.
About 2,400 kg per cubic meter, or 150 pounds per cubic foot.
Divide by 27.
Use π × radius² × height. For a 1 ft diameter and 4 ft depth, the volume is 3.14 ft³.
Many people add 5% to 10%, more for uneven ground. Ask your supplier for advice.
No. Reinforcement is separate, and it takes up very little volume, so it does not change the estimate much.
Yes. It is free, with no registration and no limits.
It uses standard formulas and the numbers you enter. Real quantities depend on the site, the mix, and the materials, so treat the results as estimates and add a margin.
A few of the most-used tools in each hub.
This calculator is for general planning and educational use. It gives estimates only, and real quantities depend on the site, the mix, the materials, and the way the work is done. It is not an engineering design. Structural concrete and anything that carries loads or affects safety must follow the design, specification, and supervision of a qualified engineer and your local building rules. Follow safety guidance when you handle cement and concrete.