Concrete Calculator: How Much Concrete, Cement, Sand, and Gravel Do You Need?

Use this free concrete calculator to estimate the volume of concrete for a slab, footing, wall, column, or round post hole. It converts the volume to cubic meters, cubic feet, and cubic yards, estimates the number of pre-mix bags, and finds the cement, sand, and aggregate for a mix ratio such as 1:2:4. You can add extra for waste. Steps are included. No signup needed.

Concrete Calculator

Estimate concrete volume, ready-mix quantity, pre-mix bags, cement, sand, and gravel for your construction project.

Project Dimensions

Site-mix material estimates use a dry volume factor of 1.54 and an approximate cement density of 1,440 kg/m³.

Your Concrete Estimate

Concrete Volume (Including Waste)
1.26 m³
1.65 cubic yards
Base Volume1.20 m³
Waste Volume0.06 m³
Cubic Feet44.50 ft³
Concrete Weight3,024 kg

Purchase Estimate

Ready-mix concrete: 1.26 m³
Cement Bags—
Sand—
Aggregate—
Calculation steps
Volume = Length × Width × Thickness
4 × 3 × 0.1 = 1.20 m³
With 5% waste = 1.26 m³

Concrete Volume Formulas

ShapeFormula
SlabLength × Width × Thickness
Strip FootingLength × Width × Depth
WallLength × Height × Thickness
Rectangular ColumnWidth × Depth × Height
Round Column / Post Holeπ × Radius² × Height
Waste AllowanceBase Volume × (1 + Waste %)

Common Concrete Conversions

ConversionEquivalent
1 cubic meter35.3147 cubic feet
1 cubic meter1.308 cubic yards
1 cubic yard27 cubic feet
1 foot12 inches
1 meter100 centimeters
1 meter1,000 millimeters

Concrete weight is estimated at approximately 2,400 kg per cubic meter (150 lb per cubic foot). Actual density varies with the mix and materials.

How to Use This Concrete Calculator

  1. Choose the shape: slab, footing (strip), wall, rectangular column, round column or post hole.
  2. Enter the dimensions (length, width, thickness or depth, or diameter and height). Choose your unit: meters, centimeters, millimeters, feet, or inches.
  3. Enter the number of pieces if you have more than one (such as four columns).
  4. Add a waste allowance (a common choice is 5% to 10%).
  5. Choose how you will buy concrete: ready-mix (by volume), pre-mix bags (choose the bag size), or mix yourself (choose the mix ratio and the cement bag size).
  6. Click Calculate.

Keep all the dimensions in consistent units, or use the unit selector for each measurement.

What You’ll See in Your Results

  • The concrete volume in cubic meters, cubic feet, and cubic yards
  • The volume with waste added
  • The number of pre-mix bags (80 lb, 60 lb, or 50 lb), rounded up
  • For a site mix: the cement bags (50 kg), and the sand and aggregate volumes
  • The weight of the concrete
  • Steps with your numbers

Concrete Volume Formulas

Slab or wall (a rectangular box): Volume = Length × Width × Thickness

Strip footing: Volume = Length × Width × Depth

Rectangular column: Volume = Width × Depth × Height (× number of columns)

Round column or post hole (cylinder): Volume = π × (Diameter ÷ 2)² × Height

With waste: Volume to order = Volume × (1 + Waste %)

Unit conversions:

  • 1 cubic yard = 27 cubic feet = 0.7646 cubic meters
  • 1 cubic meter = 35.3147 cubic feet = 1.308 cubic yards
  • 12 inches = 1 foot, and 100 cm = 1 meter

Weight of concrete: about 2,400 kg per cubic meter (150 lb per cubic foot)

Concrete Calculator Examples

All answers are rounded for display.

Example 1: A Slab (Metric)

A slab that is 4 m long, 3 m wide, and 0.1 m (100 mm) thick.

  • Volume = 4 × 3 × 0.1 = 1.2 m³ (about 1.57 yd³)
  • With 5% waste: 1.2 × 1.05 = 1.26 m³
  • With 10% waste: 1.2 × 1.10 = 1.32 m³

Example 2: A Slab (US Units)

A slab that is 10 ft by 10 ft and 4 in thick.

  • Thickness = 4 ÷ 12 = 0.333 ft
  • Volume = 10 × 10 × 0.333 = 33.33 ft³ = 1.23 yd³
  • 80 lb bags (0.6 ft³ each): 33.33 ÷ 0.6 = 55.6, so 56 bags
  • With 10% extra: 33.33 × 1.10 ÷ 0.6 = 61.1, so 62 bags

Example 3: A Larger Slab

A garage slab that is 24 ft by 24 ft and 6 in thick.

  • Volume = 24 × 24 × 0.5 = 288 ft³ = 10.67 yd³
  • This is far too much to mix from bags (480 bags of 80 lb). Ready-mix is usually the practical choice.

Example 4: A Strip Footing

A footing that is 20 m long, 0.45 m wide, and 0.3 m deep.

  • Volume = 20 × 0.45 × 0.3 = 2.7 m³
  • With 5% waste: 2.84 m³

Example 5: Round Columns

Each column has a diameter of 0.3 m and a height of 3 m.

  • Radius = 0.15 m
  • One column: π × 0.15² × 3 = 0.212 m³
  • Four columns: 0.848 m³

Example 6: A Post Hole

A post hole with a diameter of 12 in (1 ft) and a depth of 4 ft.

  • Volume = π × 0.5² × 4 = 3.14 ft³ = 0.116 yd³
  • 80 lb bags: 3.14 ÷ 0.6 = 5.2, so 6 bags

Example 7: A Wall

A wall that is 5 m long, 2.4 m high, and 0.2 m thick.

  • Volume = 5 × 2.4 × 0.2 = 2.4 m³

Example 8: Materials for 1 m³ of Concrete (1:2:4)

Dry materials take up more space than the finished concrete, because there are gaps between the particles. A common factor is 1.54.

  • Dry volume = 1 × 1.54 = 1.54 m³
  • Total parts = 1 + 2 + 4 = 7
  • Cement = 1.54 ÷ 7 = 0.22 m³, which is 0.22 ÷ 0.0347 = 6.34 bags (50 kg)
  • Sand = 0.22 × 2 = 0.44 m³
  • Aggregate = 0.22 × 4 = 0.88 m³

Example 9: Materials for 1 m³ of Concrete (1:1.5:3)

  • Total parts = 1 + 1.5 + 3 = 5.5
  • Cement = 1.54 ÷ 5.5 = 0.28 m³ = 8.07 bags
  • Sand = 0.28 × 1.5 = 0.42 m³
  • Aggregate = 0.28 × 3 = 0.84 m³

Example 10: A Slab with a Mix Ratio

A slab that is 5 m by 4 m and 0.15 m thick, with a 1:1.5:3 mix.

  • Wet volume = 5 × 4 × 0.15 = 3 m³
  • Dry volume = 3 × 1.54 = 4.62 m³
  • Cement = 4.62 ÷ 5.5 = 0.84 m³ = 24.2 bags (so, 25 bags)
  • Sand = 0.84 × 1.5 = 1.26 m³
  • Aggregate = 0.84 × 3 = 2.52 m³

Example 11: The Weight of Concrete

3 m³ × 2,400 kg per m³ = 7,200 kg (7.2 tonnes).

Plan for the weight when you move, carry, or support the concrete.

Example 12: Bags per Cubic Yard

One cubic yard is 27 ft³.

Bag sizeYield per bagBags per yd³
80 lb0.60 ft³45
60 lb0.45 ft³60
50 lb0.375 ft³72

Yields differ by brand, so check the label.

Example 13: Ordering Ready-Mix

A pour of 3 m³ with 5% extra: 3 × 1.05 = 3.15 m³ to order. Ready-mix suppliers have their own ordering units and minimums, so ask the supplier.

Common Mix Ratios (by Volume)

Mix (cement : sand : aggregate)Common nameCement per m³ (50 kg bags)
1 : 1 : 2M25about 11.1
1 : 1.5 : 3M20about 8.1
1 : 2 : 4M15about 6.3

These figures use a dry volume factor of 1.54 and a bag volume of 0.0347 m³. The grade names (M15, M20, M25) come from standards used in some regions. Mix ratios, grades, and water-cement ratios differ by country, standard, and use.

 

Structural concrete (footings, columns, beams, slabs that carry loads) should follow the mix design and specification from a qualified engineer. Ratio-based mixes are for estimates and simple work only.

Pre-Mix Bag Yields (Approximate)

Bag sizeYield
80 lb (36 kg)about 0.6 ft³
60 lb (27 kg)about 0.45 ft³
50 lb (23 kg)about 0.375 ft³

Check the yield printed on the bag you buy.

Bags or Ready-Mix?

 Pre-mix bagsReady-mix
Best forSmall jobs, such as posts and small slabsLarger pours
EffortYou mix and carry every bagDelivered, but you need to be ready to place it
CostHigher per volumeUsually lower per volume on bigger jobs
TimingYou control itYou must be ready when the truck arrives

As a rough guide, many people switch to ready-mix when a job needs more than 1 to 2 cubic yards (about 1 to 1.5 m³), but prices and minimum orders differ. Ask for local quotes.

Tips for Estimating Concrete

  • Measure twice. A small error in thickness changes the volume a lot.
  • Add 5% to 10% for waste, spills, and uneven ground.
  • Check the subgrade. A low spot needs more concrete.
  • Round up the number of bags.
  • Use consistent units, and convert thickness (such as inches to feet) before you multiply.
  • Plan the placing and finishing before you order. Concrete starts to set quickly.
  • Plan for curing. Concrete needs time and moisture to gain strength.
  • Ask your supplier about the mix, the slump, and the delivery.

Safety Notes

  • Wet cement and concrete are alkaline and can burn skin and eyes. Wear gloves, long sleeves, eye protection, and boots, and rinse any splashes off right away.
  • Cement dust is harmful to breathe. Use a dust mask when you handle dry cement.
  • Bags and wheelbarrows are heavy. Lift with care.
  • Structural work (foundations, beams, columns, retaining walls, and roof slabs) needs proper design, reinforcement, and supervision by qualified people.

Common Mistakes

  • Mixing units (such as feet for the length and inches for the thickness).
  • Forgetting to convert thickness to the same unit as the length and width.
  • Not adding waste.
  • Using the dry volume as the finished volume. The 1.54 factor goes from finished (wet) volume to dry materials.
  • Forgetting that bag yields differ.
  • Ordering exactly the calculated amount. Running short mid-pour is costly.
  • Using a ratio-based mix for structural work without an engineer’s design.
  • Ignoring weight when you plan supports and transport.

Concrete Calculator vs. Other Tools

  • Surface Area Calculator: the area of shapes (useful for forms and finishing).
  • Circle Calculator: area and circumference (useful for round columns).
  • Ratio Calculator: simplify and scale ratios (useful for mix ratios).
  • Percentage Calculator: percent of a number (useful for waste).
  • Rounding Calculator: round bags and volumes.

Frequently Asked Questions (FAQ)

How do I calculate how much concrete I need?

 Multiply the length, width, and thickness of the area (in the same unit) to get the volume. For a 4 m by 3 m slab that is 0.1 m thick, the volume is 1.2 m³. Add 5% to 10% for waste.

About 1.23 cubic yards (33.33 cubic feet). With 10% extra, about 1.36 cubic yards.

About 45 bags, based on a yield of 0.6 cubic feet per bag (27 ÷ 0.6).

For a 1:2:4 mix, about 6.3 bags of 50 kg cement. For a 1:1.5:3 mix, about 8 bags. These use a dry volume factor of 1.54.

About 1.54. Dry cement, sand, and aggregate take up more space than the finished concrete.

1 part cement, 2 parts sand, and 4 parts coarse aggregate, by volume.

 About 2,400 kg per cubic meter, or 150 pounds per cubic foot.

Divide by 27.

Use π × radius² × height. For a 1 ft diameter and 4 ft depth, the volume is 3.14 ft³.

 Many people add 5% to 10%, more for uneven ground. Ask your supplier for advice.

No. Reinforcement is separate, and it takes up very little volume, so it does not change the estimate much.

Yes. It is free, with no registration and no limits.

It uses standard formulas and the numbers you enter. Real quantities depend on the site, the mix, and the materials, so treat the results as estimates and add a margin.

Disclaimer

This calculator is for general planning and educational use. It gives estimates only, and real quantities depend on the site, the mix, the materials, and the way the work is done. It is not an engineering design. Structural concrete and anything that carries loads or affects safety must follow the design, specification, and supervision of a qualified engineer and your local building rules. Follow safety guidance when you handle cement and concrete.